Element in Dubai Science Park: 2026 Apartment Prices, Handover & Rental Yield Analysis
Standing at the intersection of Umm Suqeim Street and Marabea Road on a sunny morning in September 2026, the ongoing evolution of Dubai Science Park is immediately obvious. Once known strictly as a commercial free zone for pharmaceutical labs and energy research firms, this corner of Al Barsha South 2 is rapidly maturing into an integrated residential district with projects like Element by Iman Developers leading the new wave of construction.
For property investors monitoring the outer corridor of Al Barsha South, Element represents an intriguing case study in modern boutique development. With smart-home automation and resort-style communal amenities, understanding the real market economics behind this project requires separating developer marketing claims from verifiable transaction metrics.
At a glance | Details |
|---|---|
Project | Element by Iman Developers |
Location | Dubai Science Park, Al Barsha South |
Reported Pricing | AED 850000 to AED 1750000 |
Gross Yield | 7.5% to 8.2% indicative |
Target Handover | Q4 2026 to Q1 2027 |
Developer | Iman Developers |
Reported Market Pricing and Floor Plan Configurations

According to transaction reports registered with the Dubai Land Department, residential units at Element in Dubai Science Park traded at an average market valuation of AED 1350 per square foot as of September 2026. Secondary market aggregators and agency disclosures indicate that one-bedroom residences typically trade between AED 850000 and AED 1150000 depending on elevation and layout orientation.
Two-bedroom family apartments in the project reflect reported resale asking prices ranging from AED 1400000 to AED 1750000 as of September 2026. All cited figures reflect historical market sales records and remain indicative, meaning prospective buyers must verify direct availability and contractual pricing independently. This publication holds no marketing mandate and never provides real estate brokerage services.
One Bedroom Dimensions
Standard one-bedroom layouts at Element span between 680 and 820 square feet, integrating built-in kitchen appliances and smart climate sensors. These configurations specifically target medical researchers, clinical trial staff, and tech professionals working in nearby commercial towers.
Two Bedroom Configurations
Two-bedroom apartments offer footprints ranging from 1050 to 1280 square feet with dedicated utility storage and dual en-suite bathrooms. These larger floor plans cater primarily to young families seeking proximity to reputable private schools along Hessa Street.
Looking past glossy marketing brochures reveals that compact one-bedroom units in Al Barsha South consistently command the highest tenant absorption rates.
Al Barsha South Rental Yields Compared Across Communities
Evaluating rental yield potential requires benchmarking Dubai Science Park against neighboring mid-market master developments across the southern highway belt. Tenancy registration figures compiled through official Ejari databases show average gross yields for modern one-bedroom units in Al Barsha South hovering between 7.5 percent and 8.2 percent as of September 2026.
While gross yields appear competitive compared to prime waterfront districts, net returns depend heavily on annual service charges and maintenance provisions. Investors should note that historical yields do not guarantee future rental income and all yields remain strictly indicative.
District | Gross Yield | Service Fee |
|---|---|---|
Science Park | 7.8% indicative | AED 15 per sqft |
Jumeirah Village | 8.1% indicative | AED 14 per sqft |
Arjan Corridor | 7.4% indicative | AED 13 per sqft |
Smart-Home Features and Architectural Specifications
Architectural guidelines reviewed by Dubai Municipality highlight how newer residential projects in commercial zones must meet stringent structural efficiency benchmarks. Element integrates automated keyless access, smart lighting control systems, and energy-efficient double-glazed curtain walls designed to minimize summer air conditioning loads.
Community specifications released by TECOM Group confirm that Dubai Science Park combines dedicated office complexes with green community parks and pedestrian retail promenades. This dual-use master zoning provides residents with direct access to supermarkets, fitness facilities, and outpatient healthcare centers within walking distance.
Automated smart thermostat controls linked to tenant mobile applications
Dedicated covered basement parking equipped with electric vehicle charging stations
Rooftop infinity swimming pool alongside private wellness and sauna pavilions
Full keyless biometric access across all building entry points and elevators
Smart climate systems are not just aesthetic perks in Dubai because energy savings directly reduce tenant utility bills during extreme summer peaks.
Step-by-Step Off-Plan Purchase Verification Process
Acquiring off-plan property in Dubai requires rigorous adherence to statutory buyer protection laws. Regulatory guidelines published on the UAE Government Portal outline the exact sequence of legal verifications an investor must complete before signing any purchase contract.
Infrastructure plans published by RTA Dubai indicate future road expansions connecting Al Barsha South directly to the metro transit network. Completing your regulatory due diligence ahead of contractual execution ensures your funds remain safeguarded in government-monitored escrow accounts throughout construction.
Verify the project registration status and approved escrow account number on the official Dubai REST application.
Review the developer track record and construction progress audit percentage via Dubai Land Department portals.
Ensure your initial purchase deposit is payable solely into the designated escrow account rather than corporate operating accounts.
Confirm that your Oqood interim registration application is submitted to formalize pre-title deed ownership rights.
Retain an independent property inspection engineer to conduct a snagging audit prior to formal handover acceptance.
Infrastructure and Connectivity Surrounding Dubai Science Park
Urban transit infrastructure significantly influences long-term residential capital appreciation and tenant retention rates. Developer announcements hosted by Iman Developers emphasize direct connectivity to both Sheikh Mohammed Bin Zayed Road and Al Khail Road, enabling commute times of under twenty-five minutes to Downtown Dubai and Dubai Marina.
Public transportation links continue to expand as local transit agencies deploy feeder bus routes connecting Dubai Science Park directly to the Mall of the Emirates metro hub. Commercial research labs operated by international pharmaceutical companies continue to anchor tenant demand by drawing specialized professionals into the district.
Highway Access Routes
Motorists benefit from immediate slip-road access onto Umm Suqeim Street, avoiding bottleneck congestion common to older central suburbs during morning rush hours.
Tenant Employment Base
Over four hundred corporate and research entities operate within Dubai Science Park, establishing a captive tenant base of chemists, lab technicians, and corporate directors.
A building located near major highway exits reduces daily commute frustration, making it significantly easier to maintain high tenancy occupancy.
Investment Risks and Mandatory Financial Disclosures
Prospective buyers must weigh tangible market risks before committing capital to off-plan residential developments in secondary growth corridors. Construction handover delays, potential service charge escalations upon owners association formation, and competitive pipeline deliveries across Al Barsha South remain genuine operational considerations.
This article is published solely for educational and market journalism purposes and does not constitute financial or real estate advice. All prices, rental estimates, and project timelines are indicative as of September 2026, and purchasers must verify all contractual covenants directly with licensed legal counsel and certified real estate authorities.
Handover schedules are subject to statutory developer grace periods of up to twelve months under standard contracts
Service charges established by community management companies can compress net yields below projected targets
Secondary market liquidity during the construction phase depends heavily on overall macro credit sentiment
FAQ
What is the expected handover timeline for Element in Dubai Science Park?
Construction audit records indicate an anticipated completion target between late 2026 and early 2027. Buyers should verify current construction inspection percentages directly on the Dubai REST platform as of September 2026.
Are apartments at Element freehold for foreign property investors?
Yes, Dubai Science Park is an officially designated freehold zone permitting full foreign ownership rights for expatriates of all nationalities without local partnership requirements.
What additional purchase costs apply beyond the agreed apartment price?
Purchasers must budget for the mandatory 4 percent Dubai Land Department registration fee, an administrative Oqood fee of approximately AED 3000, and standard developer documentation charges.
What tenant demographics drive rental demand in Dubai Science Park?
Rental demand is predominantly anchored by life science executives, clinical researchers, biotechnology professionals, and medical staff working within the surrounding scientific business park and healthcare institutions.
Useful Links
Dubai Land Department — official property transaction records and escrow registry
Dubai Municipality — building code and structural sustainability standards
TECOM Group — business park master community development updates
UAE Government Portal — official legal regulations for property ownership
RTA Dubai — highway connectivity and public transport expansion
Iman Developers — official developer specifications and project overview
Pair It With

— Angel Tyagi, Creator of Angel In Dubai
Prices, timings and availability may change — always check directly with the venue before visiting. Not sponsored.
Story lead: Property Finder. Reporting can be updated or withdrawn after publication — always check the original before relying on anything here.
Rates and figures are indicative and were correct as of 22 September 2026; they change often, so verify with the provider before acting. This is general information, not financial advice.
Angel in Dubai is not a real-estate broker and holds no DLD or RERA advertising permit. Any prices here are reported market data as of the date noted — not an offer, and not an invitation to buy. Verify directly with the developer or on the Dubai Land Department portal.
Rules, fees and deadlines change often. This is a general summary, not legal advice — confirm with the relevant UAE authority before acting.
Photo by Dubai Science Park Laboratory Complex - Commercial and Residential ... via web, Photo by Di via unsplash


Comments